No. | 客户 Customer | 项目名称 project | 外径 OD(mm) | 厚度 TH(mm) | 重量(吨) Weight(Ton) | 材料 Material | 标准 Standard | 订单日期 Date of order |
1 | 浙江火电建设 Zhejiang Thermal Power Construction | 方家山核电站项目 Fangjiashan Nuclear Power Plant Project | 457-1524 | 12.7-20.62 | 589.2 | A387GR11CL2-GR22CL2 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR.1-1/4Cr, 2-1/4Cr.CL22 | 2011.12 |
2 | 沈阳东管电力管道工程有限公司 Shenyang Dongguan Electric Power Pipeline Engineering Co.,LTD | 三门核电,方家山核电项目 Sanmen Nuclear Power, Fangjiashan Nuclear Power Project | 610-1016 | 9.53-25.4 | 188.09 | A387GR22CL2 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR.2-1 /4Cr CL22 | 2011.1 |
3 | 中国上海锅炉厂有限公司 China Shanghai Boiler Works Co.,LTD | 锅炉本体管道项目 Boiler Body Pipeline Project | 508-914 | 12.7-19.05 | 1676.93 | A387GR11CL2-GR22CL2 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR.1-1/4Cr, 2-1/4Cr.CL22 | 2015-2018.12 |
4 | 中国电气上海锅炉厂有限公司 China Electric Shanghai Boiler Works Co.,LTD | 上海电气安徽平山电厂项目 Shanghai Electric Anhui Pingshan Power Plant project | 1016 | 20 | 117.902 | A387GR9Cr1Mo 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR. 9Cr.CL42 | 2019.11.13 |
5 | 江苏电力装备有限公司 Jiangsu Power Equipment Co.,LTD | 印尼摩罗哇丽拉博塔项目 Moro Waili La Bota Project in Indonesia | 711-1020 | 10-22.2 | 33.034 | A387GR11CL2 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR1-1/4Cr CL22 | 2021.11.18 |
6 | 江苏电力装备有限公司 Jiangsu Power Equipment Co.,LTD | 印尼摩罗哇丽拉博塔项目 Moro Waili La Bota Project in Indonesia | 711-1020 | 10-22.2 | 32.874 | A387GR11CL2 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR1-1/4Cr CL22 | 2022.1.20 |
7 | 江苏电力装备有限公司 Jiangsu Power Equipment Co.,LTD | 乌兹别克SirdaryaCCPP项目 Uzbekistan SirdaryaCCPP project | 1118 | 12.7-41 | 73.647 | A387GR9Cr 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR 9Cr. CL42 | 2022.1.28 |
8 | 华电重工股份有限公司 Huadian Heavy Industry Co.,LTD | 射阳港电厂2*100万千瓦燃煤机组 Sheyang Port Power Plant 2*1 million kw coal-fired units | 762-1219 | 8.7-27.5 | 358.670 | A387GR11CL2-GR22CL2 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR.1-1/4Cr CL22 | 2022.3.10 |
9 | 华电重工股份有限公司 Huadian Heavy Industry Co.,LTD | 射阳港电厂2*100万千瓦燃煤发电机组扩建项目 Sheyang Port Power Plant 2*1 million kw coal-fired power unit expansion project | 762-1219 | 8.7-27.5 | 269.020 | A387GR11CL2 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR1-1/4Cr CL22 | 2022.3.21 |
10 | 中国能源建设集团天津电力建设有限公司 China Energy Construction Group Tianjin Electric Power Construction Co., LTD | 京能十堰热电联产二期工程3号机组项目 Jingneng Shiyan cogeneration Phase II Unit 3 project | 508-965 | 11.1-22.23 | 40.258 | A387GR11CL2 高温合金焊管 Superalloy welded pipe | ASTM.A691 GR1-1/4Cr CL22 | 2023.02.22 |